Our first order ships in two parts. When should the inspections happen?
Treat each shipment as its own inspection lot, inspect before goods leave the factory, and check which Incoterms rule sets when risk passes.

Our first order of tees and hoodies will ship in two containers, three weeks apart. The factory suggested one final inspection when the first container is ready. Is that enough, and how should we plan the inspections?
Main answer
With a split shipment, each part is effectively a different set of goods produced at a different time. One inspection on the first part does not tell you much about the second, which may use different fabric lots, run on different lines, or be finished in a rush. The usual practice is to treat each shipment as its own inspection lot and to inspect it when it is finished and mostly packed, before it leaves the factory.
Define the inspection lots
Sampling plans such as ISO 2859-1 work by drawing a sample from a defined lot. The lot should be goods produced under the same conditions and offered together. For a split shipment, define each shipment as a lot, and if a shipment mixes styles, decide whether each style is a separate lot. Write this into the inspection booking so the inspector samples the right cartons. Note that ISO 2859-1 was revised in 2026, so name the edition you are using.
Time each inspection
Schedule a final inspection for each part when at least most of it is finished and packed. If the first container ships early, a during-production check on the second part can catch problems while there is still time to fix them. Ask the factory for a packing list per shipment before each inspection.
Check your delivery terms
Under the ICC Incoterms 2020 rules, the delivery term sets where the seller delivers and when risk passes to the buyer. Under FOB, for example, the seller delivers when the goods are on board the vessel at the named port. ICC explanatory notes point out that FOB may not be appropriate for goods handed over before they are on board, as with containers, where FCA is often suggested. Know where risk passes, so your inspection happens before then.
Paying the balance
Link each payment to the inspection result for the corresponding shipment, so a failed second lot is not already paid for.
Keep the inspection reports with the shipping documents for each container, so any later claim can be matched to the right lot. If the factory asks to combine both parts into a single inspection for cost reasons, agree it in writing only if both parts are finished and available to sample at the same time.
Sources and further reading
- ISO 2859-1 — Sampling by attributes indexed by AQL (1999 edition page, showing its 2026 revision)
- ICC — Incoterms® 2020 rules
- ICC Digital Library — FOB explanatory notes (Incoterms® 2020)
Standards and rules are summarised from their published scope or official guidance. Use the current edition and confirm requirements for your market.
Three perspectives on this question
Purchasing perspective
I'd write into the purchase order that each shipment needs a passed final inspection before balance payment, with the lot definition attached.
Merchandising perspective
If the second shipment carries the late colours, I'd check those against the approved colour standards specifically, because they are often rushed.
QC perspective
We'd sample each shipment separately and compare defect types between them. A rise in the second lot usually points to rushing or a fabric change.
Working on a similar program?Send your tech pack, fabric references and test requirements. We reply with a quote and the questions we need answered.
Contact Knitwear BaseRelated products
Related articles
- Apparel Supplier China: Onboarding Checklist and the Terms of a First Order
- Garment Quality Inspection Process: Pre-Production, In-Line and Final Inspection Explained
- How to Start a Private Label Clothing Brand: Assets, Sequence and First Order Economics
- Custom Underwear Manufacturer: What to Lock Down Before the First Sample
- Clothing Sample Development Services: Fit Sample, PP Sample and What to Approve at Each Stage
- Compression vs Yoga Wear: Which Category to Order First
- Hoodie Order Timing: The Fall-Winter Calendar for Wholesale Buyers
- Clothing Supplier China: Red Flags in the First Three Replies
- Clothing Factory China — What Tier You Are Buying From: Factory, Trader, Agent or Hybrid
- Garment Manufacturer China: How Factory Size and Structure Change What You Actually Get

